Assembly  Plant

The Assembly Plant, which started the operation in early 1997 after moving from previous site has  currently  produces Hydraulic Excavator, Bulldozer,  and Dump Truck.

Facility in Assembly

Sub Assembly Process

Track Frame Process

Swing Circle Process (Excavator)

Control Valve Process

Floor Frame Process

Revolving  Frame Process (Excavator)

Engine Sub Process

Attachment Sub Process

Main Line Process

Station-1

-  Install Idler

 

-  Install Revolving to track frame

Station-2

-  Install Engine

 

-  Install Radiator

Station-3

Install Cabin

Station-4 ~ 8

Install Compartment, Partition & Under Cover

Station-9

Fill (Fuel, Oil & Water)

Station-10

Install Track Shoe

Station-11

Install Counter Weight

 

Install Boom & Cylinder

Station-12

Install Bucket

 

Greasing & Flushing Process

Final Process

Final Check

Quality Assurance

Machine Inspection

Warehouse

Bulk Rack 

Indoor area (for CKD & Local Component) Approx 3.200 m2.

Receiving Conveyor

Open Yard (for CKD & Local Component) Approx 7.500 m2.

Complete Machine Stock Yard Approx 6.900 m2.