Sub
Assembly Process |
|
Track
Frame Process |
 |
|
Swing
Circle Process (Excavator) |
 |
|
Control
Valve Process |
 |
|
Floor
Frame Process |
 |
|
Revolving
Frame Process (Excavator) |
 |
|
Engine
Sub Process |
 |
|
Attachment
Sub Process |
 |
|
Main
Line Process |
|
Station-1 |
-
Install
Idler |
 |
|
|
-
Install
Revolving to track frame |
 |
|
Station-2 |
-
Install
Engine |
 |
|
|
-
Install
Radiator |
 |
|
Station-3 |
-
Install
Cabin |
 |
|
Station-4
~ 8 |
-
Install
Compartment, Partition & Under Cover |
 |
|
Station-9 |
-
Fill
(Fuel, Oil & Water) |
 |
|
Station-10 |
-
Install
Track Shoe |
 |
|
Station-11 |
-
Install
Counter Weight |
 |
|
|
-
Install
Boom & Cylinder |
 |
|
Station-12 |
-
Install
Bucket |
 |
|
|
-
Greasing
& Flushing Process |
 |
|
Final
Process |
|
Final
Check |
 |
|
Quality
Assurance |
|
Machine
Inspection |
|
|
Warehouse |
|
Bulk
Rack
Indoor
area (for CKD & Local Component) Approx 3.200 m2. |
 |
|
Receiving
Conveyor
Open Yard (for CKD
& Local Component) Approx 7.500 m2.
Complete Machine Stock Yard Approx 6.900
m2. |
 |